We started this project in 2008.  The property over looks Bear Lake and is a vacation cabin and not the primary residence for the Wong family.  Phase 1 consists of designing and construction of the Trout pond, rough grading, grubbing, soil preparation, rock retaining walls, Belgard paver patios, flagstone paths with stone bridges here

Read more →